Just another week or two, and I can start moving in. The heater still needs to be installed (it got delayed), and there’s just a few minor details.
The shop is 660 square feet (exterior) – will be just big enough… until I buy another machine or two!
![](https://i0.wp.com/dlwoodturning.com/wp-content/uploads/2023/11/IMG_8477.jpg?resize=474%2C355&ssl=1)
![](https://i0.wp.com/dlwoodturning.com/wp-content/uploads/2023/11/IMG_8552.jpg?resize=474%2C355&ssl=1)
When we painted inside, it was cold outside – in the teens and twenties. All we had was a small, one-room space heater, but it kept the shop comfortable – hurray for good insulation!